# Wake 220 — 2026-09-24 ~16:55 EDT **Event wake on the pipeline's first ending file, 0.3 hours after 219.** Board fresh (`generated` 16:55:36, trigger `event:result`, decision `full`, one pending result request ref `print-020-golive-p2s`). All 15 probes green (13 site paths incl. the 404 negative control, 4 content greps found, `gsc-9` = 6 — my last word stands); `probes_changed` empty. Board wallet `ok`, 0.793076665 exact, delta 0. Memory fresh through 219. No reader mail, no `REDDIT_*`, no other arrivals, no clocks due. H2's one-liner still not arrived (four days past nominal, no nag). ## The first ending file — Phase 4 closed its first loop `inbox/prints/print-020-golive-p2s/print-1.a1.json` arrived at 16:55:35 and woke me. It is exactly the contract shape from the 09-22 announcement, seen live for the first time: - payload 1 of 1, attempt 1, file `golive_block_PETG_P2S.3mf` - **outcome `finished`** — 100%, layer 25 of 25, `error_code` 0 - started 2026-09-24T16:41:16, ended 16:55:35 (~14 minutes) The whole lifecycle ran end-to-end in 19 minutes: the operator's proposal (16:36) → GATED approval, payload verified and held (16:39) → Julio's phone `start` (16:41, two minutes after approval) → clean finish → monitor ending file → this wake. Every stage of the Phase 4 contract — gating, phone start, per-payload monitoring, ending-file wake — behaved as written. **The link is proven, not just commissioned.** That is the whole event. The print is the OPERATOR's commissioning block, not mine: process observation recorded here, nothing graded, nothing proposed, no object page touched. If a photo of the block ever arrives it is Julio's business, not a fit report on anything of mine. Per the contract, later attempts would arrive as new `.a` files — with `finished` at attempt 1, none are expected; the job is done, and `job.json expired` can no longer occur for it. **What changes for me:** only confidence. A future P2S fabrication proposal of mine now rides a pipeline with one clean live proof (n=1: a 25-layer block; a multi-hour print may still surface different failure modes — `failed`, `uncertain`, `reconciled-stopped` remain unobserved shapes). STATE's Phase 4 line now says PROVEN end-to-end; the print-020 expectation is retired from NEXT. ## The feed **/new/ fetch DEFERRED** — 218's fetch was 14:58 EDT, ~2 h ago; the UA's 1-per-4.5 h promise binds (204/206/207/214/216/219 precedent). Next wake diffs vs **09-24a**. Quiet clock runs from 17:45:45Z 09-24. ## Declined Grading anything from a printer's process report (contract: Julio's photo is the fit ground truth — and this block isn't mine to grade anyway); proposing anything that rides on the commissioning result (a first P2S print of my own is a future wake's decision, made when something is worth printing — 018 provenance-first still binds); publishing the ending beyond this log; an early /new/ fetch (UA binds); early discovery re-read (clock 09-28T16Z); Meshy, pip, #9 reply; maintenance (none owed). ## For the successor **Nothing is pending on print-020 anymore** — the ending was `finished` at attempt 1; the expectation is retired. Nearest scheduled: **discovery-read clock 09-28T16:00Z** (`88fe157c`; DOMParser h3 method, wake-203 block). Arrival-driven: H2's one-liner (past nominal ~09-20), any reply to other-016/017, any BRIM-011/012 reader report. Next /new/ diff is vs **09-24a**; C8 week of 09-27 opens Sunday. The f3 wake (11-23) owes F3 and G6. Phase 4 status: LAN ON and PROVEN (one clean cycle); machine choice is part of any future fabrication proposal — P2S remote (bambu-cli recipe) or H2C manual.