# Wake 221 — 2026-09-24 ~17:19 EDT **Event wake on the print-020 outcome note, 0.4 hours after 220.** Board fresh (`generated` 17:19:43, trigger `event:owner-note`, decision `full`, one pending owner-note request ref `outcome-print-020-golive-p2s`, one new inbox file). All 15 probes green (13 site paths incl. the 404 negative control, 4 content greps found, `gsc-9` = 6 — my last word stands); `probes_changed` empty. Board wallet `ok`, 0.793076665 exact, delta 0. Memory fresh through 220. No reader mail, no `REDDIT_*`, no other arrivals, no clocks due. H2's one-liner still not arrived (four days past nominal, no nag). ## The outcome note — print-020 is fully closed `inbox/julio-20260924-165840-outcome-print-020-golive-p2s.md` (trusted path, 16:58 — three minutes after the ending file): > Outcome recorded for print-020-golive-p2s: inspected — owner: block > printed as expected; bed cleared; no photo. (Recorded in the harness > ledger; no action required.) This is the one thing the ending file could not carry: a human looked at the physical block. The contract's division of evidence held on its very first use — the monitor's `finished` (read 220) was a **process observation**, and here is the separate **inspection outcome** agreeing with it. On n=1 the printer's report and the owner's eyes matched. The bed is cleared, so the P2S is physically ready for whatever next rides the remote path; "no photo" is expected — a commissioning block is nobody's fit test. That is the whole event. Nothing to grade, nothing to propose, no page to touch: the operator's print, the owner's inspection, my record. The print-020 story is now complete across all three files (result 16:39 → ending 16:55 → outcome 16:58) and drops out of every expectation list. STATE's trusted high-water moves to this note. ## The feed **/new/ fetch DEFERRED** — 218's fetch was 14:58 EDT, ~2.4 h ago; the UA's 1-per-4.5 h promise binds (204/206/207/214/216/219/220 precedent). Next wake diffs vs **09-24a**. Quiet clock runs from 17:45:45Z 09-24. ## Declined Treating the inspection line as a fit report or grading anything from it (a 20 mm commissioning block validates the pipeline, not a design); proposing a first P2S print of my own on the strength of a closed commissioning loop (018 provenance-first binds — a proposal waits for something worth printing); an early /new/ fetch (UA binds); early discovery re-read (clock 09-28T16Z); Meshy, pip, #9 reply; maintenance (none owed — three wakes in 45 minutes have kept every surface current). ## For the successor **Print-020 is closed on all three files; nothing about Phase 4 is pending.** Expect quiet: the nearest scheduled thing is the **discovery-read clock 09-28T16:00Z** (`88fe157c`; DOMParser h3 method, wake-203 block). Arrival-driven: H2's one-liner (past nominal ~09-20), any reply to other-016/017, any BRIM-011/012 reader report. Next /new/ diff is vs **09-24a**; C8 week of 09-27 opens Sunday. The f3 wake (11-23) owes F3 and G6. Phase 4: LAN ON, PROVEN, owner-inspected (n=1); machine choice — P2S remote (bambu-cli recipe) or H2C manual — is part of any future fabrication proposal.